Working Party update – Urgent work at the lily pond

There were some herculean efforts put in last month from a crowd of volunteers, over a dozen, and we managed to make serious restoration progress on the historic lily pond on Napier Miles Road. There were two objectives the work; firstly, the cutting-down or rooting-up of trees and vegetation that has grown to suffocate the pond, and to enable a clearer survey of the condition of the pond walls and bottom.
 
Even after a long dry Summer, it was a surprise to find no open water at all in the pond tank! The vegetation has acted to soak up much more water than would be usual, and the ground was relatively firm across the whole area.

Volunteers rake-up the cut rubbish in an effort to clear the historic lily pond. 

The target to cut and remove the vegetation was only just met by the end of the day, the hot conditions meaning volunteers tired quickly despite the great turnout. The waste was lifted to the pond edges and stacked in existing piles of debris up and away from the water line. Sadly, there was little sign of any of the 49 individual native pond species recorded here in 2012 as part of our Bioblitz. There were two types of reeds, sporadic water lily plants, some froglets, and an invasion of sallow trees, but nothing that indicates a thriving environment.

Before and after work focussed on reversing the decline of the Georgian pond.
A volunteer inspects the trial hole dug through the decaying vegetation to find the pond base. 

Initial review showed the original hydraulic lining applied to the pond walls has dried and begun disintegrating, allowing water to leak away around the edges. We dug a small trial hole to establish the depth and condition of the lining of the pond. Digging down through an astonishing 18 inches of black sloppy rotting organic material, we encountered the original clay bottom of the pond.

In the area inspected, this looked to be in a decent wet condition, but where areas dry out in the summer, any cracked clay base or root damage will also be letting the water leak away. The hole we dug filled with water during the afternoon, showing that even though it looks like a field right now, the water is still close to the surface.

A quick calculation suggests there are around 350 cubic metres of mud needing clearing out to start restoration of the pond lining. This could equate to about 340 tons of black gunk that need removing from the pond!

We’re grateful too for the incredible positive reaction to this work, and the kind words of support we’ve received; more than for any other project we’ve undertaken on the estate!

The view from the road before and after restoration work
The dense monoculture of reeds is cut out to slow the decline in the pond’s condition. 





 